BOQ formats
Choose one of our standard formats, or upload a sample of your own BOQ and we'll produce your quantities to match its layout, numbering and columns.
ARM4 trade bill
IrelandAgreed Rules of Measurement, 4th Edition (SCSI / CIF)
Traditional Irish bill of quantities, measured in accordance with ARM4 and grouped by trade.
Best for: Main contractors and tendering in Ireland
| Item | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| 3/4/A | Excavate trench for foundations not exceeding 1.00 m deep, commencing at reduced level | 18 | m³ | – | – |
| 3/4/B | Plain in-situ concrete C25/30 in foundations poured against excavated faces | 12 | m³ | – | – |
Sections (14)
Preliminaries · Demolitions & alterations · Excavation & earthwork · Concrete work · Masonry · Carpentry · Roofing · Windows & doors · Finishes · Plumbing & drainage · Electrical (provisional) · External works · Provisional sums & contingencies · Summary
NRM2 work-section bill
UKRICS New Rules of Measurement 2 (NRM2)
Detailed measurement for building works to NRM2 work sections.
Best for: UK tendering and contractors pricing to NRM2
| Item | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| 5.6.1 | Excavation to foundation trenches, commencing at existing ground level, max depth not exceeding 2 m | 18 | m³ | – | – |
| 11.2.1 | Mass concrete foundations, poured on or against earth | 12 | m³ | – | – |
Sections (15)
Preliminaries · Off-site manufactured materials · Demolitions · Excavating & filling · In-situ concrete works · Masonry · Structural metalwork · Carpentry · Roof coverings · Windows, screens & lights · Doors, shutters & hatches · Floor, wall, ceiling & roof finishings · Drainage above ground · Drainage below ground · Provisional sums
Elemental cost plan
Ireland & UKNRM1 / SCSI elemental format
Quantities grouped by building element (substructure, frame, envelope…) for cost planning and developer appraisals.
Best for: Developers, architects and early-stage cost planning
| Item | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| 1.1 | Substructure: strip foundations, ground slab and DPM | 145 | m² GIFA | – | – |
| 2.5 | External walls: 350 mm cavity wall with rendered finish | 210 | m² | – | – |
Sections (16)
Substructure · Frame · Upper floors · Roof · Stairs · External walls · Windows & external doors · Internal walls & partitions · Internal doors · Wall finishes · Floor finishes · Ceiling finishes · Fittings · Services (provisional) · External works · Preliminaries & contingencies
Trade package
Ireland & UKTrade-based schedule
Quantities for one or more trades, laid out for a subcontractor to price.
Best for: Subcontractors and main contractors letting packages
| Item | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| DL.001 | 12.5 mm plasterboard on 70 mm metal stud partition, 2.7 m high, both sides | 96 | m² | – | – |
| DL.002 | Skim coat finish to plasterboard walls | 192 | m² | – | – |
Sections (4)
Scope & exclusions · Measured items · Provisional items · Summary
Simple builder's schedule
Ireland & UKPlain quantities schedule
A straightforward list of items with quantities and units, grouped by stage of work.
Best for: Small builders and self-builders
| Item | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Foundation concrete | 12 | m³ | – | – |
| 2 | Concrete blocks 100 mm (inner leaf) | 1,650 | nr | – | – |
Sections (7)
Groundworks · Structure · Roof · First fix · Second fix · Finishes · External
Your own format
Upload a sample BOQ (Excel preferred, PDF accepted) with your order. We follow its sections, numbering, columns and description style so the output drops straight into your estimating process. Saved for future orders.
Start an order