BQBOQ Online

BOQ formats

Choose one of our standard formats, or upload a sample of your own BOQ and we'll produce your quantities to match its layout, numbering and columns.

ARM4 trade bill

Ireland

Agreed Rules of Measurement, 4th Edition (SCSI / CIF)

Traditional Irish bill of quantities, measured in accordance with ARM4 and grouped by trade.

Best for: Main contractors and tendering in Ireland

ItemDescriptionQtyUnitRateAmount
3/4/AExcavate trench for foundations not exceeding 1.00 m deep, commencing at reduced level18m³––
3/4/BPlain in-situ concrete C25/30 in foundations poured against excavated faces12m³––
Sections (14)

Preliminaries · Demolitions & alterations · Excavation & earthwork · Concrete work · Masonry · Carpentry · Roofing · Windows & doors · Finishes · Plumbing & drainage · Electrical (provisional) · External works · Provisional sums & contingencies · Summary

NRM2 work-section bill

UK

RICS New Rules of Measurement 2 (NRM2)

Detailed measurement for building works to NRM2 work sections.

Best for: UK tendering and contractors pricing to NRM2

ItemDescriptionQtyUnitRateAmount
5.6.1Excavation to foundation trenches, commencing at existing ground level, max depth not exceeding 2 m18m³––
11.2.1Mass concrete foundations, poured on or against earth12m³––
Sections (15)

Preliminaries · Off-site manufactured materials · Demolitions · Excavating & filling · In-situ concrete works · Masonry · Structural metalwork · Carpentry · Roof coverings · Windows, screens & lights · Doors, shutters & hatches · Floor, wall, ceiling & roof finishings · Drainage above ground · Drainage below ground · Provisional sums

Elemental cost plan

Ireland & UK

NRM1 / SCSI elemental format

Quantities grouped by building element (substructure, frame, envelope…) for cost planning and developer appraisals.

Best for: Developers, architects and early-stage cost planning

ItemDescriptionQtyUnitRateAmount
1.1Substructure: strip foundations, ground slab and DPM145m² GIFA––
2.5External walls: 350 mm cavity wall with rendered finish210m²––
Sections (16)

Substructure · Frame · Upper floors · Roof · Stairs · External walls · Windows & external doors · Internal walls & partitions · Internal doors · Wall finishes · Floor finishes · Ceiling finishes · Fittings · Services (provisional) · External works · Preliminaries & contingencies

Trade package

Ireland & UK

Trade-based schedule

Quantities for one or more trades, laid out for a subcontractor to price.

Best for: Subcontractors and main contractors letting packages

ItemDescriptionQtyUnitRateAmount
DL.00112.5 mm plasterboard on 70 mm metal stud partition, 2.7 m high, both sides96m²––
DL.002Skim coat finish to plasterboard walls192m²––
Sections (4)

Scope & exclusions · Measured items · Provisional items · Summary

Simple builder's schedule

Ireland & UK

Plain quantities schedule

A straightforward list of items with quantities and units, grouped by stage of work.

Best for: Small builders and self-builders

ItemDescriptionQtyUnitRateAmount
1Foundation concrete12m³––
2Concrete blocks 100 mm (inner leaf)1,650nr––
Sections (7)

Groundworks · Structure · Roof · First fix · Second fix · Finishes · External

Your own format

Upload a sample BOQ (Excel preferred, PDF accepted) with your order. We follow its sections, numbering, columns and description style so the output drops straight into your estimating process. Saved for future orders.